Skip to content

Professional Cloud Architect · Domain 6: Ensuring solution and operations excellence · 12% of the exam

Task 6.1: Understanding the principles and recommendations of the operational excellence pillar of the Google Cloud Well-Architected Framework

Operational readiness, incident and problem management, managing and optimizing cloud resources, automation and continuous improvement as the framework describes them.

Study it

  • The operational excellence pillar

    Lesson coming

Sample questions

Try each one before opening the answer. Every option is explained, with the Google Cloud documentation page that proves it.

Question 1 · choose 1

Operators change production firewall rules and instance sizes directly in the Google Cloud console, and recent outages were traced to undocumented manual changes. Which practice from the operational excellence pillar of the Well-Architected Framework addresses this?

  1. ARestrict console access to one senior operator who makes every change
  2. BExport Cloud Audit Logs to BigQuery and review the changes each month
  3. CManage changes as code in version control with reviewed pipelines
  4. DOversize every instance so that operators rarely need to resize them
Show the answer and why
  • ARestrict console access to one senior operator who makes every change

    Incorrect

    Changes stay manual and undocumented, and one person becomes a bottleneck and a single point of failure.

  • BExport Cloud Audit Logs to BigQuery and review the changes each month

    Incorrect

    Reviewing logs afterward detects changes; it does not prevent bad ones or make them repeatable.

  • CManage changes as code in version control with reviewed pipelines

    Correct

    The pillar's automate-and-manage-change principle calls for infrastructure as code and a structured change process, which makes every change reviewed, recorded and repeatable.

  • DOversize every instance so that operators rarely need to resize them

    Incorrect

    Larger instances do not stop undocumented console edits, and firewall rules would still be changed by hand.

Operational excellence treats change as code: proposals are reviewed, applied by automation and recorded, so outages from ad hoc console edits stop.

Question 2 · choose 1

A team will launch a new customer-facing service next month. Following the operational excellence pillar's principle of operational readiness, what should the team establish before launch?

  1. ASpecific, measurable SLOs for the critical user journeys, with monitoring and alerts
  2. BA 100% availability target, so that every single failure is treated as an SLO breach
  3. CSLOs written after the first major incident shows what users care about
  4. DA CPU utilization threshold for each VM as the main measure of service
Show the answer and why
  • ASpecific, measurable SLOs for the critical user journeys, with monitoring and alerts

    Correct

    The pillar asks teams to define SMART SLOs and SLAs for critical workloads and back them with monitoring and alerting.

  • BA 100% availability target, so that every single failure is treated as an SLO breach

    Incorrect

    A 100% target is unrealistic and leaves no error budget for change.

  • CSLOs written after the first major incident shows what users care about

    Incorrect

    Waiting for an incident means launching without agreed expectations.

  • DA CPU utilization threshold for each VM as the main measure of service

    Incorrect

    Resource metrics do not reflect what users experience of the service.

Operational readiness means agreeing on measurable performance expectations and monitoring them from day one, not discovering them in production.

Question 3 · choose 1

During recent outages, several engineers changed things at once, nobody updated stakeholders, and fixes were improvised. Which practice from the operational excellence pillar should the architect introduce?

  1. AA rule that the most senior engineer alone may take any action during an outage
  2. BDefined incident roles, such as an incident commander, with documented runbooks
  3. CMore alerting policies so that more engineers join every incident
  4. DRoot cause reviews that begin once the next quarter's planning ends
Show the answer and why
  • AA rule that the most senior engineer alone may take any action during an outage

    Incorrect

    One person cannot investigate, communicate and fix at once, and this creates a bottleneck.

  • BDefined incident roles, such as an incident commander, with documented runbooks

    Correct

    Clear roles, communication protocols and runbooks or playbooks give a coordinated, repeatable response to incidents.

  • CMore alerting policies so that more engineers join every incident

    Incorrect

    Paging more people adds to the uncoordinated activity that caused the problem.

  • DRoot cause reviews that begin once the next quarter's planning ends

    Incorrect

    Delayed reviews do not fix how incidents are run while they happen.

Managing incidents well depends on preparation: defined roles, communication and documented procedures, which the pillar lists under clear incident response procedures.

Question 4 · choose 1

Operators spend hours each week on the same manual steps: restarting a stuck batch job, resizing disks that fill up, and rotating log files on VMs. Mistakes in these steps have caused outages. Which approach does the operational excellence pillar recommend?

  1. AWrite a more detailed manual checklist for each of the routine operations tasks
  2. BHire additional operators so that each person repeats fewer tasks
  3. CAutomate the routine tasks with tested tooling and configuration management
  4. DSchedule the routine tasks for nights, when traffic is at its lowest
Show the answer and why
  • AWrite a more detailed manual checklist for each of the routine operations tasks

    Incorrect

    Better checklists still rely on people repeating manual steps correctly.

  • BHire additional operators so that each person repeats fewer tasks

    Incorrect

    Adding people scales the toil instead of removing it.

  • CAutomate the routine tasks with tested tooling and configuration management

    Correct

    Automating configuration and routine management reduces the risk of human error that manual processes carry.

  • DSchedule the routine tasks for nights, when traffic is at its lowest

    Incorrect

    Moving manual work to nights changes the timing, not the error risk.

Automation is a core operational excellence practice: it removes repetitive manual work and the errors that come with it.

Question 5 · choose 2

A retailer's flash sale in two months will need three times the usual Compute Engine and GPU capacity. Following the capacity planning guidance in the operational excellence pillar, which TWO steps should the team take ahead of the sale? (Choose TWO.)

  1. ARely on autoscaling within the current quotas during the sale
  2. BMove the sale's frontend VMs to Spot VMs to free up capacity
  3. CEstimate the quota needs and request quota adjustments in advance
  4. DUse future reservations to assure capacity for the GPU machines
  5. ESet the VM groups to their peak size permanently from today
Show the answer and why
  • ARely on autoscaling within the current quotas during the sale

    Incorrect

    Autoscaling stops at the quota limit, so it cannot reach three times the usual capacity.

  • BMove the sale's frontend VMs to Spot VMs to free up capacity

    Incorrect

    Spot VMs can be preempted at the busiest moment, which is a risk for a sale.

  • CEstimate the quota needs and request quota adjustments in advance

    Correct

    The pillar advises estimating quota requirements and requesting adjustments before the resources are needed.

  • DUse future reservations to assure capacity for the GPU machines

    Correct

    For specialized hardware such as GPUs, future reservations give assurance that the capacity will be there.

  • ESet the VM groups to their peak size permanently from today

    Incorrect

    Paying for peak capacity for two months is wasteful compared with planning for the event.

Capacity planning means knowing the limits and securing resources before a known peak, rather than finding the ceiling during the event.

Practise domain 6 →Practise all domains →